Sam Sjolander 18110 Outback Lakes Trail Humble, TX 77346 Home: 281-651-2591
email: sam.sjolander@yahoo.com
Cell: 832-741-9428willing to work anywhere in
greater Houston area. SAP
planner with advanced excel skills including maintenance and turnaround
planning including field coordination and is highly skilled in communicating
with the client, also able to make decisions, excellent problem solving, and
assists in all aspects of the planning process with excellent customer
relations. Results-oriented team player who works well under pressure, meets
deadlines, and produces high-quality results. Utilize various computer
programs including 7 years of SAP experience as well as a proficient user of
Primavera version P6 and Microsoft Projects scheduling tools. Also I have an
extensive knowledge of the procurement process. Have excellent verbal and
written skills.
LyondellBasell
(VAM, BDO, QE1 Turnarounds) via: CDI Engineering
Solutions March
2012-June 2014 Turnaround Mechanical Field Planner Receive
each scope item, plan the work accordingly which involves piping work, or
mechanical equipment repairs, new installation. Create a folder for each
scope item with all details: including all isometric drawings, bill of
material(s), pictures required for a complete folder. ·
Using
Primavera P6 scheduling tool to create templates that are used to make a plan
for each item, including all resources involved of each work item. Scoped
out the material needed and entered those items into a (Turnaround Database)
Linked all documentation from a shared drive to each associated scope item.
Communicated with operations employees to verify the work processes are
accurate with the scope of work, modified as needed. BP Texas City (UU3, Merox, DDU) via:
Critical Path Resource, Inc.September 2011-February 2012 Turnaround Mechanical, Field Planner ·
I was hired
during the early execution phase of the UU3 turnaround to correct several
paperwork issues that were created prior to me being hired during the
planning process, included working closely with execution to correct. I
successfully completed this task, was involved with the planning process and
execution during two more turnarounds Merox,
DDU. Receive
work scope, planned all work accordingly. Including piping work, mechanical
equipment repairs, new installation, stepping out the work processes involved
and estimating all the cost involved. Procuring
the materials needed per job scope, communicated with the buyer on dates and
time of delivery. ·
Worked
closely with engineering, quality control department with getting the correct
documentation for the job packs including P&ID(s), isometric drawings and
piping specifications. Continued
working closely with execution during outage to procure any material needed
for discoverable work items. Sam Sjolander 18110 Outback Lakes Trail Humble, TX 77346 Home: 281-651-2591
email: sam.sjolander@yahoo.com
Cell: 832-741-9428willing to work anywhere in
greater Houston area. ExxonMobil (Baytown Olefins Plant) via:
Infinity Maintenance LP.August
2004-September 2011 Piping, Fixed Equipment Maintenance Planner
/ Buyer ·
Proficient
user of SAP MM ver 7.20 G9P process. Planning of mechanical equipment
maintenance and piping repairs that included control valves, safety valves,
and exchanger cleaning and repairs including new piping installation. ·
Coordinated
closely with plant personnel including operations, mechanical engineering,
also by attended weekly meetings to determine scope of repairs needing to be
planned in a fast paced environment. ·
Attended by
weekly scheduling meetings where my input was vital to verify planned items
would be worked accordingly. Contacting multiple vendors getting
competitive price quotes and procurement of these materials as needed, also
creating non-approved vendor contracts for procurement purposes and working
on site, including verification of delivery dates, material accuracy. Complied job packages including all
P&ID’s, isometric drawings, pictures for reference, material needed to
complete the task, inputting each items steps into SAP including all
resources required and creating Microsoft Projects schedule as needed, safety
execution plans for executing the plan in the field. ExxonMobil (Baytown Olefins Plant) via:
Infinity Maintenance LP.June 2004-August 2004 Turnaround Field Coordinator ·
Worked as
ExxonMobil contact person during outage, worked with several contractors
which included mechanical repair work, piping repairs and new piping and
equipment replacement. ·
Coordinate
with operations, contractors to verify that the work is being completed
safely and worked per schedule, any issues that would arise I would address
accordingly. ·
Updating the
scheduler daily with work completion, items still needing to be completed and
got the scope of work for the following day. Also communicated that
information to the contractor. ExxonMobil (Baytown Olefins Plant) via:
Infinity Maintenance LP.September 2001-May 2004 Capital Projects Pipe Foreman Supervisor over projects for the ExxonMobil
capital projects group. ·
Was an
integral part of the pre job walk through, attended meetings which included
mechanical, operations engineering, management to assess projects overall
impact, including any constructability issues also including any safety
concerns and logistics issues prior to completion of engineering and planning
phase of projects. Supervised employee’s doing various jobs
from fabrication of piping, installation of new equipment. ·
Also worked
through the “Welding on Live Equipment” procedure, supervised the
installation including working with plant personal to help coordinate the
execution of this very critical task. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|